Somerset flood defence | www.skanska.cz
Reducing flood risk. The scheme at Beer Wall has been delivered in three phases, designed to reduce flood risk in the Sowy and Kings Sedgemoor Drain river systems. The team raised a 500-metre stretch of road by over 1.2 metres at its lowest point, in Muchelney. This should maintain road access to the village if there is a repeat of the flooding ...
Get Price